Season 13
19 episodes
0/19 watched
Swipe a row to mark watched · long-press to mark up to there
- S13E3
Modern Colonial: Shingles and Windows
Sep 16, 2002On the roof, asphalt shingles are installed; back on the ground, windows are put in. Included: home designs of the firm of noted 20th-century architect Royal Barry Wills.
- S13E4
Modern Colonial: Radiant Heating System and Ductwork
Mar 24, 2002Bob Vila surveys the HVAC ductwork and the crew installs a new radiant heating system. Also: a tour of a the Julia Wood House in Falmouth, Massachusetts.
- S13E5
Modern Colonial: Gas Fireplaces and Cedar Shingles
Sep 30, 2002Cedar shingles are applied to the roof and a gas fireplace unit is installed on the ground floor. Also: a trip to Canada to see how wood shingles are milled.
- S13E8
Modern Colonial: Garage Door and Generator Installation
Oct 21, 2002A generator system is installed, while new carriage-style doors make their way onto the garage. Also: a tour of the Jackson homestead in Newton, MA.
- S13E9
Modern Colonial: Wood Floor Installation
Oct 28, 2002Bob takes a look at some hardscape work being done, specifically a new cobblestone driveway apron, but the real story is flooring.
- S13E11
Modern Colonial: Interior Door Installation and Plan Modifications
Nov 11, 2002Work continues in the master suite. Master carpenter Bob Ryley installs a new door and applies interior trim.
- S13E12
Modern Colonial: Interior Woodwork
Nov 18, 2002Crown moldings are added in the dining room. Bob Vila visits the North Bennet Street School to learn about its preservation carpentry program.
- S13E13
Modern Colonial: Exterior Landscaping
Nov 25, 200230mBob Vila turns his attention to exterior work on the house, starting with a tour of Mahoney's Nursery led by landscape designer Ruth Foster.
- S13E14
Modern Colonial: Mechanical Systems and Basement Refinishing
Dec 2, 2002Mechanical systems are being installed throughout the house.
- S13E15
Modern Colonial: Mechanical Systems and Interior Finishing
Dec 9, 2002Bob Vila tours the finished landscape at the project house before visiting the historic gardens at Glen Magna farm in Danvers, MA.
- S13E16
Modern Colonial: Kitchen Cabinetry and Countertops
Dec 16, 2002Bob Vila focuses on the work being done in the kitchen of the modern, colonial-style home.
- S13E17
Modern Colonial: Bedroom Amenities
Dec 23, 2002The crew works to install the perimeter fence, while inside a custom closet system is added.
- S13E18
Modern Colonial: Interior Decorating Tour
Dec 30, 2002Windows are installed, paint prep is performed, and decorating is done in the bedroom. Also: a tour of the Lyman Estate.
- S13E19
Modern Colonial: Workshops and Woodworking
Jan 5, 2003A planter box is constructed for the sunroom. Also, Bob Vila tours Winterthur, a historic estate in Delaware, and The North Bennet Street School, an arts instruction institution in Boston.
- S13E20
Modern Colonial: Classic Interiors and Cabinet Install
Jan 12, 2003Shelving and cabinet installation are underway. Bob Vila tours Winterthur and The North Bennet Street School.
- S13E21
Modern Colonial: Wood Floor Finishing
Jan 19, 2003Techniques for achieving a smooth, even finish with hardwood flooring are demonstrated. Also: a tour of the Hancock Land Company's sustainable forestry operation in Casco, ME.
- S13E22
Modern Colonial: Interior Craftwork
Jan 26, 2003Bob Vila focuses on the decorative interior finish work. Also: touring a selection of famous parlors featuring American decorative arts.
- S13E24
Modern Colonial: More Interior Design Projects
Feb 10, 2003Interior design work continues. Also: Bob Vila takes another trip to Winterthur, this time to tour the Chinese Parlor.
- S13E25
Modern Colonial: Appliance Installation and Furniture Making
Feb 17, 2003The washer and dryer and shower hardware go in and a medicine cabinet is installed. Bob Vila returns to the North Bennet School.